Our Professional Construction Standards
1. Site Marking & Preparation
2. Excavation
3. Base Layer (3/4 Clear Gravel)
4. Dual-Direction Compaction
5. Surface Leveling
6. HPB Application
7. Precision Leveling
8. Stone Installation
9. Polymeric Sand (G2) Application
10. Final Compaction & Refill
11. Edge Reinforcement
12. Surface Setting
13. Site Clean-up
• Determine and mark the precise construction area according to the design plan.
• Professionally excavate the soil to the required depth for a solid foundation.
• Add the first layer of structural base using 3/4 clear gravel for superior drainage.
​
• Use a jumping jack compactor to compress the base horizontally and then vertically.
• Use a high-frequency vibratory compactor to flatten the gravel surface.
• Apply HPB (High Performance Bedding) and use a vibratory compactor for maximum stability.
• Level the surface with a precise 2%-3% slope to ensure optimal water drainage.
• Manually lay the paving stones with artistic precision and tight joints.
• Sweep premium G2 Polymeric Sand into the joints to prevent weeds and erosion.
• Use the vibratory compactor again to settle the sand, then sweep in more sand as needed.
• Install professional-grade aluminum edging to prevent stones from shifting over time.
• Lightly water the surface to activate the bonding agent in the polymeric sand.
• Remove all debris and perform a comprehensive clean-up of the construction site.