Our Professional Construction Standards

1. Site Marking & Preparation

2. Excavation
 

3. Base Layer (3/4 Clear Gravel)

4. Dual-Direction Compaction

5. Surface Leveling

6. HPB Application

7. Precision Leveling

8. Stone Installation 

9. Polymeric Sand (G2) Application 

10. Final Compaction & Refill 

11.  Edge Reinforcement 

12. Surface Setting 

13. Site Clean-up 

• Determine and mark the precise construction area according to the design plan.

• Professionally excavate the soil to the required depth for a solid foundation.

• Add the first layer of structural base using 3/4 clear gravel for superior drainage.

​

• Use a jumping jack compactor to compress the base horizontally and then vertically.

• Use a high-frequency vibratory compactor to flatten the gravel surface.

• Apply HPB (High Performance Bedding) and use a vibratory compactor for maximum stability.

• Level the surface with a precise 2%-3% slope to ensure optimal water drainage.

• Manually lay the paving stones with artistic precision and tight joints.

• Sweep premium G2 Polymeric Sand into the joints to prevent weeds and erosion.

• Use the vibratory compactor again to settle the sand, then sweep in more sand as needed.

• Install professional-grade aluminum edging to prevent stones from shifting over time.

• Lightly water the surface to activate the bonding agent in the polymeric sand.

• Remove all debris and perform a comprehensive clean-up of the construction site.